Modernization of the GoodMills Polska production plant

“The involvement of iPS Control® employees in the implementation of a technically difficult and timely task exceeded our expectations, especially since the launch of the new system took place in a strict time regime related to the 24/7 operation of our plant. The works were carried out at a time convenient for us, allowing production to run smoothly. – Vice President

Investment description

Modernization of the control system of the entire production plant: reception and elevator, 3 grinding lines with cleaning plants, flour collection lines, mixing room and flour loading. Works carried out in a system ensuring the continuity of the plant’s operation.

Effect

  •  delivery of new Siemens S7-1500 PLC controllers
  • delivery of a server and 6 two-screen operator stations
  • integration of existing IO modules and scales
  • development of software for PLC controllers
  • full visualization of the SCADA process
  • implementation of the Nutrilo® production management system

Benefits

  •  automation of the production management and reporting process
  • improvement of process safety
  • full diagnostics and process control, including performance parameters
  • integration with the ERP system
  • ensuring the continuity of work and the possibility of developing the system for the coming years

Solutions

  • Nutrilo® applicationPLC controllers – Siemens S7-1500
  • SCADA visualization – Siemens WinCC V7
  • DELL rack server

Robotized bag palletizing line

“The solutions implemented by iPS Control® allowed us to increase production efficiency, save time and money, while maintaining high quality standards” Effect production and delivery

More

Contact us

Poznańska street 23
Jasin 62-020 (post office: Swarzędz)

+ 48 61 840 80 26

office@ipscontrol.pl

Call Now Button