“The involvement of iPS Control® employees in the implementation of a technically difficult and timely task exceeded our expectations, especially since the launch of the new system took place in a strict time regime related to the 24/7 operation of our plant. The works were carried out at a time convenient for us, allowing production to run smoothly. – Vice President
Investment description
Modernization of the control system of the entire production plant: reception and elevator, 3 grinding lines with cleaning plants, flour collection lines, mixing room and flour loading. Works carried out in a system ensuring the continuity of the plant’s operation.
Effect
- delivery of new Siemens S7-1500 PLC controllers
- delivery of a server and 6 two-screen operator stations
- integration of existing IO modules and scales
- development of software for PLC controllers
- full visualization of the SCADA process
- implementation of the Nutrilo® production management system
Benefits
- automation of the production management and reporting process
- improvement of process safety
- full diagnostics and process control, including performance parameters
- integration with the ERP system
- ensuring the continuity of work and the possibility of developing the system for the coming years
Solutions
- Nutrilo® applicationPLC controllers – Siemens S7-1500
- SCADA visualization – Siemens WinCC V7
- DELL rack server